WHAT HAPPENS AFTER APPROVAL?
Congratulations! You now have approval to build your dream home!
At this stage, if we have a Development Approval, we’ll start to prepare for construction by getting a Construction Certificate (CC). If the proposal has been approved under CDC, we’re ready for the Construction Stage.
As part of preparation for both approval pathway and as part of the construction stage, we will produce detailed construction documentation drawings which include finalised finishes and fixture selections and also develop details for the kitchen and bathrooms areas.
To help you feel right at home, we can also start to prepare your interior styling package, with mood boards and visulisations for your internal spaces.
WHY DO WE NEED CONSULTANTS AND WHICH ARE REQUIRED?
Depending on the approval pathway, there are a number of consultants required to provide reports, documentation and statements for the authority approval.
Surveyor
*Survey Plan and boundary peg out
Town Planner
* Statement of Environmental Effects (SEE)
Heritage Consultant
* Statement of Heritage Impacts (SOHI)
Stormwater Consultant
* Stormwater drawings and design statement
BASIX
* BASIX certificate
Landscape Consultant
* Landscape design and documentation
Arborist
* Arborist Report
As part of our services, we will provide you with 2 x fee proposals from each required consultant, who will be engaged by you and coordinated by our team to ensure the consultants provide their services in a timely manner.
What are the Pros and Cons of a Development Application process?
Complying Development Certificate
A CDC is a fast tracked combination of two stages of Development Application and Construction
Certificate, by the removal of council’s involvement and any potential neighbour objections. CDC is subject to conditions under the State Environmental Planning Policy (SEPP) 2008, which is identified and approved by a Private Certifying Authority. Not all projects can be taken through this pathway as there are strict guidelines and requirements, which may not suit your site or your design needs.
P R O S
* Speed:
CDC offers a much faster approval process compared to DA (3-4 weeks) since it involves clear assessments against predetermined criteria. This can expedite project timelines and reduce approval-related delays.
*Certainty:
CDC provides a level of certainty as projects that meet specific criteria are guaranteed approval, eliminating the need for discretionary assessment. This clarity can streamline the development process and reduce uncertainty.
C O N S
* Limited Flexibility:
CDC has strict criteria that projects must meet to qualify for approval. This limits design flexibility and may not accommodate projects with unique requirements or site conditions.
WHICH PARTS OF A PROJECT CAN YOU HELP ME WITH?
* Design Brief Development
From the initial stages of the project to completion, we’re here to help you every step of the way. Our services and involvement can be in the following stages,
* Concept Design
* Design Development
* Submission for approval
* Pre-construction documentation
* Detailed construction documentation and Interiors
* Interior Styling
WHAT IS A SURVEY AND WHY DO I NEED ONE?
- Site Boundaries
- Easements or rights-of carriageway
- Contours
- Location of buildings
- Location of trees and canopy spread
- Windows
- Driveways
- Roof Ridge and gutter heights
A survey may already exist for your property, from a previous DA application. If you do already have
a survey, please provide it at the earliest convenience. In order for the survey to be applicable, it needs to be dated within the last 5 years.
If you do not have a survey, we will provide you with details of our preferred surveyors, who will arrange a time and date to visit your property and prepare the survey. This process can take up to 4 weeks, hence why we encourage that you start the process as soon as possible.
As part of our services and prior to preparing a design concept, we will also undertake an internal measure and photographic survey (not required for knockdown and rebuild), to clearly understand the space and its opportunities and constraints.
WHAT IS THE DIFFERENCE BETWEEN A DA AND CDC?
Whether you’re looking to do an alteration and addition or a knockdown rebuild for your property, you’re required to get an approval through either,
- Development Application
- Complying Development Application
One of the approval pathways may be more suited to your home and project depending on,
- The council area you’re building in
- The policies and planning that apply to your land
- The design of the home
- The timeframe of the design and build
WHO IS AN ARCHITECT AND WHY SHOULD YOU HIRE ONE?
An architect is a licensed professional who designs and oversees the construction of buildings, blending artistic vision with technical expertise to create functional, aesthetically pleasing, and sustainable spaces.
WHAT CAN I EXPECT WORKING WITH AN ARCHITECT?
AT WHAT POINT SHOULD I INVOLVE AN ARCHITECT IN MY PROJECT?
As early as possible! Architect’s creative direction and advice can be more effective the earlier they are involved in the process. Early involvement allows the architect to understand your vision, budget, and objectives thoroughly. This also allows the architect to make the best of any available opportunities, help you explore options you may not have considered and avoid potential pitfalls.
What are the Pros and Cons of a Complying Development Certificate process?
Development Application
A Development Application is prepared and submitted to your local council which contains documentation for the council to understand what your home will look like, the material which will be used and any impact which you may have over the surrounding neighbours. There are specific requirements and controls for each development, depending on your local council.
P R O S
* Flexibility
The DA process allows for more flexibility in design and development compared to CDC. It’s suitable for projects that don’t meet all the criteria for complying development.
- Customization
With the DA process, projects can be customized to suit specific requirements and site conditions, allowing for more tailored solutions. - C O N S
* Time-Consuming
The DA process tends to be more time-consuming than CDC due to its requirement for public consultation and comprehensive assessment by planning authorities. You can expect the approval process to take anywhere from 4-12 months, depending on the project, council and number of applications in council. - Uncertainty:
There’s a level of uncertainty associated with the DA process, as approval is subject to merit based assessment by planning authorities. This uncertainty can lead to unpredictability in project timelines and outcomes.